solutions
Engine Testing: Automotive Powertrain
At Sciemetric, we know engines inside and out. It’s where we started in manufacturing in the early 1990s. Today our systems ensure the quality of millions of engines every year, around the world. Find out why.
Tags:solutions
发动机制造:汽车动力总成
Sciemetric 对发动机了如指掌。20 世纪 90 年代初,Sciemetric 因此进入制造领域。今天,Sciemetric 系统每年为全球数百万台发动机质量把关。发现原因。
Tags:solutions
Automotive Transmission Testing
Sciemetric test systems are used to find defects at all stages of the transmission assembly process. The full solution includes traceability and enables continuous improvement. Learn more about typical quality checks in a transmission production line.
Tags:solutions
变速器制造:汽车动力总成
Sciemetric 针对汽车动力总成采用的变速器制造和检测方法以过程检测和监控为基础,可提高质量和合格率,减少缺陷品。
Tags:solutions
轴制造:汽车动力总成
在一条典型的轴生产线上,即从组装到最终检测,至少有 20 个点可用于监控检测过程。大多数制造商无法做到对上述每一个点进行监控,无形中导致缺陷产品的产生。Sciemetric 可解决这一问题。
Tags:solutions
Functional Test of Assemblies and Subassemblies
Test the function and performance of complex sub-assemblies and parts with Sciemetric’s real-time process monitoring and multi-channel signature analysis.
Tags:solutions
Use Data to Optimize Manufacturing Leak Test
Many manufacturers rely on leak test as an end-of-line test. However, Sciemetric’s approach to in-process testing allows you to monitor leak test at critical junctions along the manufacturing line so that defects are found as soon as possible.
Tags:solutions
Centralize Process Data for Quick, Industry 4.0 Insight
Data left trapped in silos across the plant floor leaves a team blind to issues that impact quality, yield and profitability. Centralizing all process data into a common repository yields a powerful resource for achieving Industry 4.0 benchmarks.
Tags:solutions
Improve Root-Cause Analysis With Manufacturing Data
Use manufacturing data from in-process testing, process monitoring and digital signature analysis to trace root cause and contain quality spills with Sciemetric.
Tags:resources
Application Note | Axle Suspension Component Assembly: Press Force Verification of Bushing Assemblies
Since the part is welded to the front axle, the assembly of the front axle bushing into a stamped metal bracket is a critical process. The visual and random mechanical inspections conducted post-assembly by a manufacturer were insufficient to identify defective parts and provide 100% guarantee of the integrity of the assembly during the service life of the vehicle. Read the application note to learn how Sciemetric fixed the problem.
Tags: